Temporary pump installed to supplement water treatment plant

Greg Forbes
Posted 1/14/22

A temporary pump has been installed to help feed the Blair water treatment plant.

Al Schoemaker, Public Works Director for Blair, said the temporary intake pump helps supply water from the Missouri River to the water treatment plant. He said the pump is necessary because of low water levels in the Missouri River.

This item is available in full to subscribers.

Please log in to continue

Log in